Outdoor facts needed
Geothermal ground connection
Keep the loop choice open. Gather a general access description and available site records so the project team can investigate suitable options.
Interactive home system map
Choose your heating system, current fuel and outdoor access. The geothermal planner turns those details into installation questions you can carry straight into your quote request.
Existing home · Distribution not yet identified
Outdoor facts needed
Keep the loop choice open. Gather a general access description and available site records so the project team can investigate suitable options.
Conversion scope
Connect the heat-pump selection to room loads, distribution, electrical requirements and the plan for removing or retaining old equipment.
Identify the room system
Identify whether the rooms use ducts, hot-water emitters, steam, radiant floors or electric heaters. That distinction changes the indoor scope before equipment is selected. Cooling needs its own room-delivery and moisture-control plan.
Preparation aid only. No system size, loop design, property approval, price, savings or incentive eligibility is calculated. No request has been sent.
SYRACUSE GEOTHERMAL — HOME SYSTEM BRIEF Your geothermal retrofit map Method prepared September 26, 2026 Project: Existing home Distribution: Not sure yet Heating source: Not sure yet Outdoor access: Not sure yet Comfort goal: Include cooling 1. GEOTHERMAL GROUND CONNECTION — Outdoor facts needed Keep the loop choice open. Gather a general access description and available site records so the project team can investigate suitable options. 2. GEOTHERMAL HEAT PUMP EQUIPMENT — Conversion scope Connect the heat-pump selection to room loads, distribution, electrical requirements and the plan for removing or retaining old equipment. 3. GEOTHERMAL HEATING AND COOLING — Identify the room system Identify whether the rooms use ducts, hot-water emitters, steam, radiant floors or electric heaters. That distinction changes the indoor scope before equipment is selected. Cooling needs its own room-delivery and moisture-control plan. QUESTIONS FOR THE PROPOSAL 1. What site information and access assessment are needed before proposing the ground connection? 2. What equipment and fuel currently heat the home, and what other appliances share that fuel? 3. How does heat reach each room now, or how is it planned for the new home? 4. Which rooms receive cooling, through what terminals, and where are moisture and condensate handled? 5. Who confirms the applicable permits, performs commissioning and supplies completion records? DOCUMENTS TO REQUEST - Room-by-room heating and cooling assessment with its building assumptions - Written scope with included work, allowances, exclusions and responsible parties UNRESOLVED - Outdoor access and usable work area - Current heating source - Heat distribution and room coverage Preparation aid only. No system size, loop design, property approval, price, savings or incentive eligibility is calculated. No request has been sent.
The map uses your selections to organize the questions into three connected layers: ground connection, indoor equipment and delivery to rooms. It changes the priorities for existing homes, new construction, different heating distribution and uncertain outdoor access.
It does not calculate heating capacity, bore depth, savings, price or incentive eligibility. A yard description is not a site assessment, and an existing radiator or duct system is not automatically suitable for reuse.
“Not sure” keeps the question open. “No private outdoor space” brings property rights and connection feasibility forward; it does not pronounce the home eligible or ineligible. Existing geothermal brings records and compatibility into the replacement discussion.
Copy the current result, download a text file or print it. If you choose “Use This Map for My Geothermal Quote,” the map stages its technical summary in this browser tab for up to 30 minutes. You can edit it on the next page. Nothing is sent to a contractor or email address.
Reset clears the selections and staged map. If your browser blocks temporary storage, use the copy or download option and paste the text into the project brief. See the privacy explanation for details.
Use the existing-home retrofit guide, room-distribution comparison and ground-loop guide for deeper explanations. New builds have a separate coordination sequence.
Method prepared September 26, 2026. Confirm the site findings and current requirements during geothermal system design.